Calgary & Surrounding Area

Bathroom Remodeling in Calgary, Designed Around the Way You Live

A calm, considered bathroom shaped around your morning routine and your evenings — with finishes that feel intentional and a timeline we keep you close to throughout.

Where to start

What a thoughtful bathroom remodel really means

The bathroom is the most private room in a Calgary home and, quietly, the hardest-working one. Tucked behind the tile sits the plumbing, the venting, a moisture barrier, and a subfloor that has been quietly absorbing steam and splashes for years. A considered remodel is far more than a fresh vanity and a new colour on the walls — it is a chance to open the room up, resolve what time has worn down, and reassemble it so the space feels good to step into every single morning for decades to come.

We design and build across the full spectrum, and from our very first conversation we are clear with you about which kind of project yours is:

  • Refresh: a new vanity, toilet, fixtures, lighting, and paint within the existing layout and plumbing — the gentlest, quickest way to make the room feel new again.
  • Full gut: tile and drywall taken back to the studs, fresh waterproofing, a re-tiled tub or shower, new flooring, vanity, and fixtures throughout.
  • Layout change: relocating the shower, repositioning the toilet, borrowing space to widen the room, or reimagining a tub as a curbless walk-in — work that reaches into the plumbing and, at times, the framing.
  • Ensuite and basement baths: serene primary ensuites with twin vanities and generous showers, and bringing a warm, well-finished bathroom to life in a Calgary basement.

Naming your project honestly is where everything begins. It is the difference between a figure you can plan your life around and one that quietly shifts once the work is underway.

Calgary specifics

What a Calgary bathroom is quietly asked to endure

Our climate asks a great deal of a bathroom. Calgary’s dry air and hard, mineral-rich water are unforgiving on fixtures and grout over time. Long, cold winters mean a bathroom on an exterior wall — or one tucked into a basement — needs genuine insulation and a fan that truly draws moisture away, or condensation lingers and, eventually, finds its way behind the tile.

The house itself tells a story, too. A 1970s bungalow in Acadia or Brentwood keeps different secrets than an inner-city infill in Altadore or a newer home out in Mahogany or Auburn Bay. Older houses often reveal cast-iron drains, undersized venting, or a subfloor gone soft beneath the toilet. We go looking for these things while we are still shaping the price, so the figure we give you reflects the room as it really is.

  • A proper waterproofing membrane behind every wet wall and shower base — built to keep water where it belongs, not left to chance.
  • An exhaust fan correctly sized and vented to the outside, so each winter’s moisture leaves the room rather than settling in it.
  • Slope and drainage detailed with care on showers and curbless entries, so water always travels where it is meant to.
  • Permits drawn and inspections passed whenever the work touches plumbing or electrical.
Before and after of a dated Calgary bathroom remodeled with a modern walk-in shower and floating vanity
A dated four-piece bathroom reimagined as a brighter, calmer room that is easier to live with.
How we work

One studio holding the whole project together

What tends to unravel a bathroom renovation is rarely the tile itself — it is the quiet handoffs between trades, where things slip through. A plumber wraps up and moves on, a tiler arrives before the waterproofing has been signed off, and no one is minding the calendar. We hold the demolition, plumbing, electrical, waterproofing, tiling, and finishing as a single, well-paced sequence, so each stage flows into the next and the room is never left waiting for someone to return.

Your conversation is with us, not with a scattered collection of trades. We bring in the licensed plumbers and electricians, time the deliveries so materials are on hand before they are needed, and keep you gently in the loop on where things stand and what is coming next. And when a wall comes down and the house surprises us, we walk you through exactly what we have found, what it takes to resolve it properly, and let you make the call — always in writing, before a single further step is taken.

Detail of a tiled shower niche with large-format porcelain tile and a matte black fixture in a Calgary bathroom
The plan

How a bathroom remodel unfolds, stage by stage

  1. Walkthrough and measure. We sit with the room, listen to how your household moves through it, note anything we are uneasy about behind the walls, and take careful measurements.
  2. Design and selections. Together we shape the layout, tile, vanity, fixtures, and lighting so they suit the space and your budget — and feel as though they have always belonged in your home rather than borrowed from a showroom floor.
  3. Written estimate. You receive a clear, itemized quote. The figure reflects the true scope, with allowances spelled out plainly so nothing arrives as an unwelcome surprise.
  4. Permits and scheduling. Where the work calls for them, we draw the permits and arrange inspections, then settle on a start date and a finish window we genuinely believe in.
  5. Demolition. The old bathroom is carefully taken out, and we confirm what is living behind the walls before anything new begins.
  6. Rough-in. Licensed plumbers and electricians complete the in-wall work, inspected before any of it is closed up.
  7. Waterproofing and tile. The membrane goes on first, then the floor and wall tile, set and grouted with patience and care.
  8. Finishing. Vanity, toilet, fixtures, lighting, mirror, and paint come together, and we walk the finished room with you to be sure every last detail feels right.
What lasts

Considered choices that age gracefully in a Calgary bathroom

A bathroom that still feels lovely a decade on comes down to a handful of decisions made thoughtfully at the start. We guide you toward finishes that take hard water, daily life, and Calgary’s freeze-thaw swings in stride.

Tile and waterproofing

Large-format porcelain across floors and wet walls leaves fewer grout lines to scrub and to fail over time. The membrane beneath it is what genuinely holds water at bay — unseen when it is done with care, and a quiet catastrophe when it is overlooked.

Showers and tubs

Curbless walk-in showers, glass enclosures, and built-in niches feel uncluttered and grow more graceful with age. We detail the slope and drain so water never gathers or wanders past the threshold.

Vanities and storage

Well-built vanities with quartz tops, soft-close drawers, and storage planned around what truly lives in your bathroom. A floating vanity lends a small Calgary room a sense of air and makes the floor beneath it effortless to keep clean.

Lighting and ventilation

Layered light at the mirror and overhead, paired with a properly vented fan. In our climate the fan is never an extra — it is what quietly protects everything else you have just invested in.

Close-up of a quartz-topped floating wood vanity with brushed fixtures and layered vanity lighting
Planning ranges

What a bathroom remodel tends to cost in Calgary

No two bathrooms are alike, so treat these as planning ranges rather than quotes. They are here to help you set a comfortable budget before a particular tile wins your heart. The figure that truly matters is the written estimate we prepare once we have spent time in the room — that one is exact, itemized, and the price we stand behind.

Refresh — same layout, new fixtures & finishes$6,000–$12,000
Full gut — stripped to studs, re-tiled, new everything$14,000–$25,000
Layout change — moving plumbing, tub-to-shower conversion$20,000–$35,000
Primary ensuite — large shower, double vanity, premium finishes$28,000–$50,000+

These ranges are for planning only. Your exact figure arrives as a written, itemized quote after a walkthrough. Permits, where they are required, and any hidden damage discovered at demolition are listed on their own, so nothing is tucked away out of sight.

What gently moves your figure up or down:

Scope and layout

Leaving the existing plumbing where it sits is far and away the biggest saving. Relocating a shower or toilet brings new plumbing, framing, and at times a permit into the picture.

Tile and material choices

The amount of tile, its format, and whether you lean toward stone, porcelain, or specialty finishes shapes both material and labour cost.

What’s behind the walls

Older Calgary homes can conceal a soft subfloor, undersized venting, or tired drains. We flag the likely culprits before quoting so the estimate holds steady.

Fixtures and glass

Frameless glass, curbless drains, heated floors, and more refined faucets and vanities each carry real cost — and each earns its place when you reach for them every day.

Good to know

Questions homeowners ask.

How long does a bathroom remodel take in Calgary?+

A gentle refresh can come together in one to two weeks. A full gut usually means three to five weeks of on-site work, while a layout change or a larger ensuite can stretch to six weeks or beyond. The variable least in our hands is the permit wait, which in Calgary often adds a couple of weeks before tools can touch the room. We give you a realistic finish window in writing before we begin — an honest one, not a hopeful figure chosen to land the project.

How much does a bathroom renovation cost here?+

As a budgeting guide, a refresh tends to settle around $6,000 to $12,000, a full gut around $14,000 to $25,000, and a sizeable ensuite or layout change comfortably above that. Think of those as ranges to plan against — your exact, itemized price comes by written quote once we have spent time in the room and seen what is living behind the walls.

Do I need a permit to renovate my bathroom in Calgary?+

If you are simply swapping fixtures and finishes within the existing layout, usually not. But the moment the work involves relocating plumbing, adding circuits, or altering structure, the City of Calgary calls for permits and inspections. When they apply, we draw the permits and arrange the inspections as part of the project, so the paperwork never lands on your plate.

Is replacing a tub with a walk-in shower something you do?+

Gladly — it is one of the most loved changes we make. Reimagining a tub as a walk-in shower opens the room up, makes stepping in feel easy and natural, and gives the space a calm, uncluttered look. Because it reaches into both the plumbing and the waterproofing, we detail the drain and slope with real care and rebuild the wet area from the ground up rather than tiling over what was there before.

What’s the difference between a refresh and a full gut?+

A refresh keeps your existing layout and plumbing and renews what you see and touch — the vanity, toilet, fixtures, lighting, and paint. A full gut takes the room back to the studs so we can replace the waterproofing, re-tile the wet walls and floor, and tend to anything hidden along the way. A gut asks more of your budget and your patience, but it is the only path to resolving what the surface keeps out of view.

What if you find damage once the walls are open?+

It does happen, especially in older Calgary homes — a soft subfloor beneath the toilet, a quiet leak, undersized venting. When we come across something, we pause, show you exactly what it is, and lay out the cost to put it right before any of that work begins. Nothing ever joins your bill without your written agreement first.

Do you handle the plumbing and electrical, or do I hire that out?+

We carry the whole project for you, licensed plumbers and electricians included, so your conversation stays with one studio rather than a handful of separate trades. We sequence the work in the right order, arrange the inspections, and keep the room moving so it never sits idle between visits.

Which areas of Calgary do you serve?+

We work throughout Calgary and the surrounding area, including Altadore and Marda Loop, Bridgeland and Renfrew, Kensington and Hillhurst, Mahogany and Auburn Bay, Tuscany and Scenic Acres, and the Beltline and Mission. If you are nearby and unsure, give us a call and ask.

Can you help with design and material selections?+

Absolutely. Bringing together tile, a vanity, fixtures, and lighting that speak to one another and suit your home is at the heart of what we do. We help you make selections that fit both the layout and the budget, so the finished bathroom feels considered and whole rather than assembled from whatever happened to be on sale.

How do I get an estimate started?+

Send along a few photos of the bathroom and a short note on what you have been imagining. Call or text us at 368-337-6704, or email info@kitchensandbathreno.com. We will arrange a walkthrough and follow up with a clear, written estimate.

Signatures Kitchen and Bath · Calgary

Ready to imagine your new bathroom?

Tell us about the room and how you long to use it. We will walk through it together, talk through the possibilities, and follow up with a clear, written estimate — no pressure, and no inflated figure.